
Here is one of the pipes sandblasted:

And painted with Rustoleum high heat ultra:


The mufflers are rattling a bit, so I hope they are not too rusted out inside. I'm halfway there on the exhaust.
I finished up the wheel & brake install today as well. I'm using a 90 degree banjo to AN at the master cylinder and then a straight AN hose with a 90 degree bend at the other end with a straight banjo to AN fitting at the caliper. I had this hose leftover from the Concours, so I decided to put it to use vs buying another hose. All the hydraulics are buttoned up now so I can start adding fluid and bleeding them, though I may wait to see if I'm going to change the handlebars to a 7/8" setup so I have a better selection of grips.
More bits and pieces are trickling in, such as the dual rear add-on lights and a brake light pulser. I've pre-wired for both of these, so they will be an easy install.
) and I now have then wired in. I found the bulb on the gear position indicator is out, and it looks like I can use a small bulb from Radio Shack for this. The bulb is like 4mm and has 2 wires. It looks like the gear position bulbs that I replaced in my red GS1000. I'm making a harness to calibrate the gauge functions, such as the fuel level. Having the sender out of the tank will be helpful to do this.





. I cleaned & treated the gas tank, and then applied the Caswell coating. Looks pretty good.






Comment