30 days, $1k, and capable of a 3-4 hour tour of San Francisco - that's about it on the rules. I have a little over two weeks left and it's still not running
(Any NorCal experts?)My goals are safe, rideable, legal (lights, reflectors, exhaust) and sorta WTF. The monoshock is a HUGE advantage over all the guys building hardtails.
Not sure exactly how it will all come together, and if you look at images from prior events, I do not intend to destroy it at the end.
So far I've extended swingarm 4 inches, and the done usual rearhoop-ectomy. Easy stuff vs. working on the carbs.
While the finished bike overall concept is still being hashed out - not sure a cafbobchopbrat has been done yet; I'm having a bear of a time with the carbs, but in looking around, that doesn't seem uncommon.
I just realized that I don't have any of the before images hosted so I can share them, but rather than retyping this later, I'll encourage a little anticipation to the thread? I'll get some posted later tonight - as they say, daylight's wastin'














Comment