
- Frame
- Clean of mounts that I wont need
- Reweld to hard tail
- Brakes
- Make new brakeline on front brake
- Probably gonna stick to that drumbrake on rear, but would be nice to throw on a discbrake in the future
- Fuelsystem
- Tear down carburators and give them a good clean
- Jet carbs, preferably with dynojet
- Restrict airflow to carbs with either pods or headers
- Find me a nice tank that suits the build
- Engine
- Adjust valves
- Exhaust
- Restrict exhausts with baffles
- Wheels
- Might be nice with a wider rim on the rear, nothing superwide, just an inch wider than stock or something like that
- Find me a thicker rear tire due to that hard tail
- Paint rims black
- Suspension
- Change parts in forks for new ones
- Change the oil in them (ofc refering to above)
- Electronics
- Get rid of the components I don't need, mainly some of the indicators on the handlebars
- New electric wires on the whole bike
- Try and find me a smaller neater speedometer
Let's run through the costs so far...
- Bike - 600$
- Metal parts on jigg - 115$
- Metal parts on frame - 570$
- Tools - 400$
- Weld restoration - 600$
Total of - 2285$











Comment