Brakes getting taken apart, painted and rebuilt with new seals, pistons, stainless lines, etc.




Not the best job but looks much nicer on the bike.
As for the r/r, it seems if I turn the cdi upside down it creates just enough space for the SH775 in the stock r/r location. The holes in the brackets are a mm or two shy so I'll try some incantations to stretch it out.
I need to be careful of edges of wires with the harness running to the top of the bracket instead of the bottom but should be able to package it safely. Only other concern are the cables from the shock rubbing on the r/r.
This is it mocked up:

I can put some foam tape on the corners and/or a sleeve of some kind on the cables.
I may end up buying a YSS rear shock down the track so those cables wouldn't be an issue then.
Hopefully I can get the r/r wired in today.






Comment