Solid State Power Box

Collapse
X
 
  • Time
  • Show
Clear All
new posts
  • salty_monk
    Forum LongTimer
    GSResource Superstar
    Past Site Supporter
    Super Site Supporter
    • Oct 2006
    • 14001
    • London, UK to Redondo Beach, California

    #241
    There's always a way.... With the SH775 it doesn't leave much room on the panel. I can extend it but then it would stick out below the side panel.

    It maybe that I instead move the flasher & perhaps the started solenoid... that's an option too.

    1980 GS1000G - Sold
    1978 GS1000E - Finished!
    1980 GS550E - Fixed & given to a friend
    1983 GS750ES Special - Sold
    2009 KLR 650 - Sold - gone to TX!
    1982 GS1100G - Rebuilt and finished. - Sold
    2009 TE610 - Dual Sporting around dreaming of Dakar..... - FOR SALE!

    www.parasiticsanalytics.com

    TWINPOT BRAKE UPGRADE LINKY: http://www.thegsresources.com/_forum...e-on-78-Skunk/

    Comment

    • posplayr
      Forum LongTimer
      GSResource Superstar
      Past Site Supporter
      • Dec 2007
      • 23673
      • Tucson Az

      #242
      Originally posted by salty_monk
      There's always a way.... With the SH775 it doesn't leave much room on the panel. I can extend it but then it would stick out below the side panel.

      It maybe that I instead move the flasher & perhaps the started solenoid... that's an option too.

      Dan,
      Ed's bike has the full size fuse box and fitted the SH-775 but without the bulky connector. . Not sure why the side panel is so different to the skunk.
      Jim

      Comment

      • posplayr
        Forum LongTimer
        GSResource Superstar
        Past Site Supporter
        • Dec 2007
        • 23673
        • Tucson Az

        #243
        I have a few orders coming in for SSPB's this week. So if you have been on the fence about moving forward, please considering doing it now. There is a lot of work to getting these things assembled and doing them in batches is much easier.

        I'm seeing a lot more work coming in the near future on other moto projects , so lead times for the SSPB will likely lengthen in the future. I'm running out of the diagonal tabbed version, but still have a few symmetrical tabbed version. Most of my reserve is the tabless versions.

        Comment

        • gspower

          #244
          Originally posted by posplayr
          I have a few orders coming in for SSPB's this week. So if you have been on the fence about moving forward, please considering doing it now. There is a lot of work to getting these things assembled and doing them in batches is much easier.

          I'm seeing a lot more work coming in the near future on other moto projects , so lead times for the SSPB will likely lengthen in the future. I'm running out of the diagonal tabbed version, but still have a few symmetrical tabbed version. Most of my reserve is the tabless versions.

          I'd like to put an order in but I'm running a GS425 and wanted to make sure someone else has done this before. I'm not sure I even have a fuse box on the old bike. Will this help me? This project is going to be the end of me.
          Last edited by Guest; 05-02-2014, 10:31 AM.

          Comment

          • tkent02
            Forum LongTimer
            Past Site Supporter
            • Jan 2006
            • 35571
            • Near South Park

            #245
            Originally posted by gspower
            I'd like to put an order in but I'm running a GS425 and wanted to make sure someone else has done this before. I'm not sure I even have a fuse box on the old bike. Will this help me? This project is going to be the end of me.
            I'm putting one on my 550 which has only the one single fuse. It should work, but it will be a little more work to separarte out the circuits.
            http://img.photobucket.com/albums/v5...tatesMap-1.jpg

            Life is too short to ride an L.

            Comment

            • astradaryl

              #246
              Yup same here I'm putting one on my 77 gs750 that has no fuse box

              Comment

              • Guest

                #247
                Any units available? or plans for making some more?

                Comment

                • posplayr
                  Forum LongTimer
                  GSResource Superstar
                  Past Site Supporter
                  • Dec 2007
                  • 23673
                  • Tucson Az

                  #248
                  Originally posted by azr
                  Any units available? or plans for making some more?
                  I have a few other people looking. I could get another run done in the next month or so. Email me at solidstatepowerbox@gmail.com.
                  Last edited by posplayr; 06-02-2014, 12:03 AM.

                  Comment

                  • Guest

                    #249
                    wouldn't work to that email, sent one to your direct email.

                    Comment

                    • posplayr
                      Forum LongTimer
                      GSResource Superstar
                      Past Site Supporter
                      • Dec 2007
                      • 23673
                      • Tucson Az

                      #250
                      Originally posted by azr
                      wouldn't work to that email, sent one to your direct email.
                      Sorry, the period in @gmail.com was missing.

                      Comment

                      • occam22

                        #251
                        spoke to you via email but I thought Id also post up here to be in on the next run.

                        Comment

                        • posplayr
                          Forum LongTimer
                          GSResource Superstar
                          Past Site Supporter
                          • Dec 2007
                          • 23673
                          • Tucson Az

                          #252
                          Originally posted by occam22
                          spoke to you via email but I thought Id also post up here to be in on the next run.
                          OK Anybody else want in on the next run let me know. I have a few things to get out of the way but plan on finishing by about the end of the month. email me at solidstatepowerbox@gmail.com

                          the diagonal tabbed ones are limited but there are plenty of tabless.

                          Comment

                          • posplayr
                            Forum LongTimer
                            GSResource Superstar
                            Past Site Supporter
                            • Dec 2007
                            • 23673
                            • Tucson Az

                            #253
                            Originally posted by posplayr
                            OK Anybody else want in on the next run let me know. I have a few things to get out of the way but plan on finishing by about the end of the month. email me at solidstatepowerbox@gmail.com

                            the diagonal tabbed ones are limited but there are plenty of tabless.
                            I'm looking to do another run. I'm starting to run out of cases and heatsinks although there are plenty of boards and other electronics parts.

                            I have emailed a few people that have asked, so if you have been thinking about getting one let me know soon.

                            $158 shipped domestic, $163 to Canada. Will be shipped before July 3rd is you get in soon.

                            Comment

                            • jwhelan65

                              #254
                              Did you get enough to do this?

                              Comment

                              • posplayr
                                Forum LongTimer
                                GSResource Superstar
                                Past Site Supporter
                                • Dec 2007
                                • 23673
                                • Tucson Az

                                #255
                                Originally posted by jwhelan65
                                Did you get enough to do this?
                                I'm running late; Plan to get them done by end of next week. Probably the last run.

                                Comment

                                Working...