Announcement
Collapse
No announcement yet.
1981 GSX1100 Katana Based Project
Collapse
X
-
Yep, not unusual and Plan A was to use a sealer but when my mate offered to mill it I wasn't going to pass on that deal.Originally posted by Blower View Post
Badgezz, we don need noh stinkin' badgezz!
Shin-Ken 1074
1982 GSX1100SXZ Wire Wheel Katana - BOM Nov 2011
1981 GSX1135 Katana Build completed Mar 2024, Curb Weight, all fluids and 21 lt fuel = 206 kg.
-
O.K. another step completed today. The head bolt posts have been milled back to new and the head is now ready for the new valve guides, seat cutting/matching valves and new valve stem seals to be installed. The same workshop is boring the barrels for the new pistons.
I will be interested to see how much lighter the 1135 barrels are when they are bored to 76 mm for the 1197cc kit. As stock they weigh 8,080 grams.
1197h by Max Mutarn, on Flickr
Last edited by Shin-Ken 1074; Yesterday, 09:00 PM.Badgezz, we don need noh stinkin' badgezz!
Shin-Ken 1074
1982 GSX1100SXZ Wire Wheel Katana - BOM Nov 2011
1981 GSX1135 Katana Build completed Mar 2024, Curb Weight, all fluids and 21 lt fuel = 206 kg.
- Likes 3
Comment
-
I have seen some bike engines finished with ceramic coatings and I like the look and by some reports the hard wearing properties of the ceramic coating compared to engine paint. So there has been a delay with the head and barrel work to have the ceramic coating applied to the head and barrel. Going with Gloss Black to match the lower engine cases. Should have the finished parts back by the end of next week.Last edited by Shin-Ken 1074; 11-17-2025, 07:19 PM.Badgezz, we don need noh stinkin' badgezz!
Shin-Ken 1074
1982 GSX1100SXZ Wire Wheel Katana - BOM Nov 2011
1981 GSX1135 Katana Build completed Mar 2024, Curb Weight, all fluids and 21 lt fuel = 206 kg.
Comment
-
Update on the parts, the people doing the ceramic coating have only just got back from SEMA and so the parts wont be ready for another week. Hope they enjoyed SEMA, what a show!Badgezz, we don need noh stinkin' badgezz!
Shin-Ken 1074
1982 GSX1100SXZ Wire Wheel Katana - BOM Nov 2011
1981 GSX1135 Katana Build completed Mar 2024, Curb Weight, all fluids and 21 lt fuel = 206 kg.
- Likes 1
Comment
-
Had a phone call today from the engineering shop doing the work on the barrels, there is good news and some bad news. The good news - head and barrels have been ceramic coated and the five plane valve seating has been completed. The bad news - first three cylinders have been bored out however, while boring cylinder #4 the sleeve has spun and done some damage. Number 4 barrel now needs a replacement stock sleeve and then bore it to 76mm so it looks like another week or so to finish the job providing the barrel has not suffered too much damage and can be saved. They are pressing out #4 sleeve now and will inspect the barrel to see what is what.
I hope it can be saved or I'll have a very nice looking, very expensive ceramic coated doorstop.Last edited by Shin-Ken 1074; Yesterday, 09:20 PM.Badgezz, we don need noh stinkin' badgezz!
Shin-Ken 1074
1982 GSX1100SXZ Wire Wheel Katana - BOM Nov 2011
1981 GSX1135 Katana Build completed Mar 2024, Curb Weight, all fluids and 21 lt fuel = 206 kg.
Comment
.png)
Comment