Yes Dale. I need to repair a broke engine mount on the Nighthawk project. Soon as thats done i can proeceed with setting the engine in the frame and getting the drives haft and swing arm installed.
I dont have a TIG and dont have the funds to just go buy one....so its look at alternatives to actually taking it to a shop and paying who knows what. I basically need 2 welds a bout 1 inch long and its done. I have ground ditches in the case and the replacement bracketry. The base metal is pretty thick there as the area is at the right rear corner of the case where its good and thick.
Was gonna do a little run and stop to let it cool. Do some more and let that cool. Do this till I have both sides welded decently and go from there is the basic plan of attack.
I dont have a TIG and dont have the funds to just go buy one....so its look at alternatives to actually taking it to a shop and paying who knows what. I basically need 2 welds a bout 1 inch long and its done. I have ground ditches in the case and the replacement bracketry. The base metal is pretty thick there as the area is at the right rear corner of the case where its good and thick.
Was gonna do a little run and stop to let it cool. Do some more and let that cool. Do this till I have both sides welded decently and go from there is the basic plan of attack.