Leave 1, 3, 5, 7 and 8 alone.GS750GUY here again. The guy that started this thread.
Thank you, thank you, thank you!!!! After 30 minutes in the garage I'm back to tell you I'm a confirmed ZIP TIE believer. It worked slicker than a whistle. I removed & put back each shim, logged the thickness and am back here in 30 minutes to tell you about it. No problems what so ever! For the guys that experienced breakage of the tie; I can't imagine what caused it. The ties I used showed little if any wear at all.
A while back I requested the email for the the shim conversion chart but for some reason am unable to open it.
Below is the readings I got from my 8 valve 78 GS750EC. According to my manual the valve gap is to run between .03 & .08 MM. The following is my list of readings. I have numbered the valve starting with valve #1 which faces the front of the bike.
Can one of my fellow GS'rs out there with a conversion chart tell me what I need to do based on the information below?
Thanks a million for everyones help with this thread!!
GS750GUY
I can't wait to ride!!!!!
INITIAL VALVE CLEARANCE MEASUREMENTS
#1 #3 #5 #7
.08MM .08MM .08MM .08MM
#2 #4 #6 #8
.09MM .11MM .11MM .08MM
SHIM THICKNESSES
#1 #3 #5 #7
2.70 2.75 2.75 2.75
#2 #4 #6 #8
2.75 2.65 2.70 2.65
Make 2, 4 and 6 one size bigger. Buy a 2.80 for #2, put the old 2.75 from #2 into #6 and put the old 2.70 from #6 into #4.