Had a phone call today from the engineering shop doing the work on the barrels, there is good news and some bad news. The good news - head and barrels have been ceramic coated and the five plane valve seating has been completed. The bad news - first three cylinders have been bored out however, while boring cylinder #4 the sleeve has spun and done some damage. Number 4 barrel now needs a replacement stock sleeve and then bore it to 76mm so it looks like another week or so to finish the job providing the barrel has not suffered too much damage and can be saved. They are pressing out #4 sleeve now and will inspect the barrel to see what is what.
I hope it can be saved or I'll have a very nice looking, very expensive ceramic coated doorstop.
Running tally = 199.557 kg.
I hope it can be saved or I'll have a very nice looking, very expensive ceramic coated doorstop.
Running tally = 199.557 kg.
Last edited:
























